loader image

Completed Projects

Well development of fields NGDU "Dossormunaygaz"

Work period: July 2022 to December 2022 Customer: JSC "Embamunaygaz" Place of execution: Republic of Kazakhstan, Atyrau Region, Makat District

Provision of full coverage with stable radio communication along the main oil pipelines. Pavlodar Branch of JSC "KazTransOil"

Work period: April 2022 to December 2022 Customer: JSC "KazTransOil" Place of execution: Pavlodar Region, Ekibastuz District

Provision of full coverage with stable radio communication along the main oil pipelines. Karaganda Branch of JSC "KazTransOil"

Work period: April 2022 to December 2022 Customer: JSC "KazTransOil" Place of execution: Karaganda Region, Abai District, Dzerzhinsky rural district, Serepta village, KPP OU "Serepta"

Landscaping of the recreation park NGDU Dossormunaygaz

Work period: August 2022 to December 2022 Customer: JSC "Embamunaygaz" Place of execution: Republic of Kazakhstan, Atyrau Region, Makat District, Dossor rural district

External power supply for the Zhaysan mine. Tap-off from the existing 35 kV overhead line "Shu - Shatyrkul" to the 35/6 kV "Zhaysan" substation

Work period: August 2022 to December 2022 Customer: LLP "Zhanahyr Projekt" Place of execution: Zhambyl Region, Shu District, Zhaysan deposit

Reconstruction of the MN "Pavlodar-Shymkent" DN 820 mm on the section 539.212-540.412 km, with a length of 1.2 km

Work period: September 2022 to December 2022 Customer: JSC "KazTransOil" Place of execution: Republic of Kazakhstan, Karaganda Region, Abai District, Dzerzhinsky rural district, Serepta village

Reconstruction of the 220 kV overhead line "TEC-3 - Zharyk substation" 1.2 km

Work period: October 2022 to December 2022 Customer: 021140000722 - LLP "Karaganda Zharik" Place of execution: Republic of Kazakhstan, Karaganda Region, Karaganda city, Oktyabrsky rural district, Oktyabrsky district

Collection system. Line D. Modification.

Work period: August 2022 to December 2022 Customer: "Total E&P Dunga GmbH" Place of execution: Republic of Kazakhstan, Mangystau Region, Tupkaragan District, Dunga deposit

Installation of oil heater H-034-0001A

Work period: August 2022 to December 2022 Customer: "Total E&P Dunga GmbH" Place of execution: Republic of Kazakhstan, Mangystau Region, Tupkaragan District, Dunga deposit

Flare system modernization at the CPF (Central Processing Facility)

Work period: August 2022 to December 2022 Customer: "Total E&P Dunga GmbH" Place of execution: Republic of Kazakhstan, Mangystau Region, Tupkaragan District, Dunga deposit

Construction of the "Water Treatment Facilities" at the Artemyevskaya mine, Artemyevsky production complex of LLP "Vostoktsvetmet"

Work period: September 2022 to May 2023 Customer: LLP "Vostoktsvetmet" Place of execution: East Kazakhstan Region, Shemonaikha city

Carrying out construction and installation works for the construction of the MTUE-VNU-0.75*3 energy complex at the "Air-lifting-cage" shaft site of the Artemyevskaya mine, APK LLP "Vostoktsvetmet"

Work period: September 2022 to March 2023 Customer: LLP "Vostoktsvetmet" Place of execution: East Kazakhstan Region, Shemonaikha city