loader image

Current Projects

Construction (installation) of geotechnological polygon facilities for 2022-24.

Location: Republic of Kazakhstan, Turkistan region, Suzak district, Karagur rural district, village of Karakur, quarter 051, structure 1 Customer: LLP "Appak" Work period: from 04.10.2022

Multifamily residential complex. Stage 2 of construction.

Location: Karaganda city, accounting quarter № 137. Intersection of Respubliki Avenue and Gudermes Street. Customer: State Institution "Construction Department of Karaganda" Work period: from 18.01.2023

Replacement of compressors positions K-2, K-3, K-4, K-5 in the VKS workshop of the PVS (1st, 2nd, 3rd, 4th startup complexes).

Location: Republic of Kazakhstan, Pavlodar region, Pavlodar city, Khimkombinatovskaya Street, 1 Customer: LLP "Pavlodar Petrochemical Plant" Work period: from 17.04.2023

Construction of the second pipeline of the water supply system "Astrakhan-Mangyshlak" with a diameter of 1220 mm and a length of 151 km (section 56-207 km).

Location: Atyrau region, Kurmangazinsky district; Atyrau region, Isatai district Customer: LLP "Main Water Pipeline" Work period: from 14.06.2023

"Reconstruction of the water pipeline № 21 from the pumping station "2nd zone" to the networks of the New City in Karaganda."

Location: Republic of Kazakhstan, Karaganda region, Karaganda city, from the pumping station "2nd zone" to the New City networks Customer: LLP "Karaganda Su" Work period: from 10.10.2022

Construction of the highway "Satpayev - Malshibai - Mausoleum Zhosykhanna, Dombaul"

Location: Ulytau region, Zhezkazgan city Customer: State Institution "Department of Passenger Transport and Highways of Ulytau Region" Work period: from 08.12.2022

Gasification of the city of Astana. Stage II of construction. High-pressure gas pipeline. (9th startup complex)

Location: Bypass road of the city of Astana Customer: State Institution "Department of Fuel and Energy Complex and Utilities of the city of Astana" Work period: from 25.07.2022

Capital repair of the rural hospital building.

Location: Karaganda region, Shet district, Akadyr village, Abai street, house 17 Customer: State-Owned Enterprise "Central District Hospital of Shet District, Health Department of Karaganda Region" Work period: from 23.01.2023

Construction of gas supply networks to residential areas of the city of Aktobe: residential areas "Zhanaaul-1", "Zhanaaul-2", "Zhanaaul-3", "Shygys-1", "Shygys-2", "Bayanaul-1", "Bayanaul-2".

Location: Republic of Kazakhstan, Aktobe region, Aktobe city, Almaty district Customer: State Institution "Department of Housing and Communal Services, Passenger Transport, and Highways of Aktobe city" Work period: from 22.07.2022

Reconstruction of domestic and drinking water treatment facilities in the city of Zhezkazgan (Stage 2).

Location: Karaganda region, Zhezkazgan city, Zhezkazgan Customer: State Institution "Department of Construction of Zhezkazgan city" Work period: from 16.06.2022

Construction of a physical culture and health complex.

Location: Karaganda region, Priozersk city Customer: State Institution "Department of Construction of Priozersk city" Work period: from 15.11.2022

Construction of a school for 150 students.

Location: Karaganda region, Bukhar-Zhyrau district, Ushtobin rural district, Novostroyka village Customer: State Institution "Department of Construction, Architecture, and Urban Planning of Karaganda region" Work period: from 31.10.2022

Extension to the existing school: 4 classrooms, a gym, a cafeteria, and four preschool classrooms.

Location: Karaganda region, Bukhar-Zhyrau district, Gagarinskoye village Customer: State Institution "Department of Construction, Architecture, and Urban Planning of Karaganda region" Work period: from 19.10.2022

Construction of a highway at the Zhaisan deposit (technological route from Zhaisan mine to Shatyrkul mine).

Location: Zhambyl region, Shu district, Zhaisan deposit Customer: LLP "Zhanahyr Projekt" Work period: from 31.03.2022

Carrying out restoration works on power unit No. 1.

Location: Republic of Kazakhstan, Pavlodar region, Industrial Zone 2 Customer: LLP "Ekibastuz GRES-1 named after Bulat Nurzhanov" Work period: from 24.08.2022

Construction of a ground-based processing complex at the "Zhalpak" deposit with a production capacity of 900 tons/year.

Location: Republic of Kazakhstan, Turkistan region, Suzak district, Suzak rural district, Zhalpak mine Customer: LLP "Mining Enterprise Ortalyk" Work period: from 14.11.2023

Construction of a power plant based on a combined cycle gas turbine unit with flexible generation mode and a total capacity of up to 1000 MW in Turkistan region.

Location: Republic of Kazakhstan, Turkistan region Customer: LLP "PGU Turkistan" Work period: from 05.02.2024

Construction of a processing complex with a capacity of 6000 tons per year of natural uranium at sections 6-7 of the "Budennovskoe" deposit. 1st startup complex.

Location: Republic of Kazakhstan, Turkistan region, "Budennovskoe" deposit Customer: LLP "Joint Venture Budennovskoe" Work period: from 16.08.2024

Construction of GZU-37 (Group Measurement Installation-37) at the Karazhanbas deposit. 1st stage of construction.

Location: Republic of Kazakhstan, Mangystau region, Tupkaragan district, Karazhanbas deposit Customer: JSC "Karazhanbasmunai" Work period: from 25.04.2024

Construction of a training polygon for the Atyrau Oil and Gas University named after Safi Otebayev.

Location: Republic of Kazakhstan, Atyrau region, Atyrau city Customer: JSC "Embamunaygaz" Work period: from 14.06.2024

Construction of a fiberglass pipeline "GU-1 AGZU 6 - CPPN" at the Akshabulak deposit.

Location: Republic of Kazakhstan, Kyzylorda region, Akshabulak deposit Customer: LLP "Joint Venture Kazgermunai" Work period: from 17.07.2024

Provision of engineering services for technical supervision of the project "Capital repair of the highway Shieli-Taykonur."

Location: Republic of Kazakhstan, Kyzylorda region, Shieli district, Shieli village Customer: LLP "KAP Logistics" Work period: from 26.08.2024

Technical supervision of the project "Capital repair of the turbine workshop building, stages 1-4 of the BTPS."

Location: Republic of Kazakhstan, Karaganda region, Balkhash city Customer: LLP "Kazakhmys Energy" Work period: from 27.05.2024

Construction of an administrative building

Place of execution: Republic of Kazakhstan, Almaty Customer: JSC "KIMEP University" Work period: from June 20, 2024

Expansion of industrial uranium mining to 2000 tons per year at Site No. 4 of the "Kulandy" mine

Place of execution: Republic of Kazakhstan, Turkestan Region, Suzak District, Budenovskoye deposit, Kulandy mine Customer: LLP "SP Akbastau" Work period: from August 28, 2024

Service for conducting technical supervision (implementation of the project for modifying the cooling system of pumping equipment) in a closed circuit at S-100, S-200, S-300, S-400, PPPN No. 1.